Here we go again, not giving up...
Taxiway N5 is permanently closed. Service drive rerouted. Safran is extending its premises south of the current building.
The bridge to the drop-off became a one-way, 2 lane road. Works ongoing for the new drop off. Sloped bridges placed to connect the parking of the sheraton building. The previous badge service center / Brussels Airport Security next to sheraton is demolished.
Glide path shelter of runway 25R moved towards N taxiway at 160m of runway centerline. Glide path mast at 140m of centerline.
The jet bridges at pier B have been renewed with new glass models.
Triangular space between Y, V1, W1:
Communication mast near old building 213
New engine test facility being built: https://pressroom.brusselsairport.be/work-starts-on-new-quieter-aircraft-engine-testing-facility-at-brussels-airport
Post can also be moved to FS2024 forum.
Any support from aerosoft? Or at least, a reply after two years?