Good evening everyone.
By the title of the topic, you can already say that I started working on the Brno-Tuřany airport, LKTB in the Czech Republic.

I've been doing it for several weeks now. The concept of building the project will be as follows. Naturally, the airport itself will be made. Scenery will be recommended for use with Orbx openLC Europe and Orbx Vector. The city will be built in separate locations. For example, such areas where the city hospital is located. On its territory there is a helipad, which will be implemented in the project. The area where the tower building in Brno is located, the castle and others.

 

Most of the textures in the project will be PBR with a resolution of 2048x2048 pixels. To date, almost all work related to land ranges, runway, markings and so on has been completed. Tomorrow I will start making lighting.

I plan to finish the project presumably in October. From time to time I will write about the development of the project.

 

7.jpg

 

5.jpg

 

6.jpg

 

2.jpg

 

 

3a.jpg

 

4.jpg

 

 

 

 

 

 

 

Link to comment
Share on other sites

The apron stands at Brno airport have been tested and are fully GSX compatible. It is very convenient to use the marshals included in the GSX kit for correct taxiing into the parking lot :)

 

18.jpg

 

16.jpg

 

14.jpg

 

 

 

Link to comment
Share on other sites

  • 2 weeks later...
Aeroklub Brno-Slatina is almost done. On all buildings, including PBR texture locators. Locator antennas, flag, windsock are animated. The grass is spread over the entire area of the airport.
The next step that I will be doing is creating signs along the runway, taxiways. After that, I will begin to build directly the passenger terminal and other buildings at the airport.
So everything goes according to the previously outlined plan :) 
 
59.jpg
 
60.jpg
 
61.jpg
 
62.jpg
 
63.jpg
 
64.jpg
 
65.jpg
 
66.jpg
 
 
 
Link to comment
Share on other sites

  • 1 month later...

Thanks I `am fine.

I interrupted work on the project for several days. I wanted to get some rest. All the same, three projects without a break, which I released, made themselves felt a little tired, rest was necessary :)
I got carried away by aquarium fish. I bought a 140 liter aquarium and two small 60 liter aquariums for spawning fish. I can say that aquarium fish are exciting :)

 


This week he returned to work on the Brno project. Now I'm working on the terminal. So, everything is fine :)

 

5.jpg

 

9.jpg

 

8.jpg

 

7.jpg

 

9.jpg

 

10.jpg

 

11.jpg

 

 

Link to comment
Share on other sites

The interior work is almost complete. The adjoining building, where baggage claim, administrative offices, etc. are located, will be without interior, so the work on the project will progress much faster.
As I said earlier, there will be 3D passengers inside the passenger terminal, some of them will be animated. They can always be turned off if necessary. PBR textures will be made for the interior. 
 
5.jpg
 
3a.jpg
 
3.jpg
 
1.jpg
 
 
 
Link to comment
Share on other sites

  • 3 weeks later...

Create an account or sign in to comment

You need to be a member in order to leave a comment

Create an account

Sign up for a new account in our community. It's easy!

Register a new account

Sign in

Already have an account? Sign in here.

Sign In Now
 Share

×
×
  • Create New...